The new waste transfer and reception hall, built by Veloop, modernised operations at Lapeco’s Kittilä waste station and made the area tidier and more pleasant than before.

A new waste transfer and reception hall, built by Veloop, was completed in Kittilä at the end of 2025. Its purpose was to bring waste collection and reception of waste within the laws and regulations, whilst also promoting a cleaner environment in the area. There had been a need for this for some time, as the previous facility in the area was too small and loading took place outside the building, which significantly increased the environmental impact due to littering.

– The new hall serves the purpose for which it was built very well. It’s fair to say that, overall, that service area has changed completely compared to before. It is now completely free of litter and odors. What’s more, pests and birds have been kept out as well, says Janne Vuolli, Operations Manager at Lapeco.

As well as ensuring that the practical arrangements run smoothly, it is extremely important to Lapeco that the waste collection points remain tidy. As the municipal association’s collection lorries already convey the message that their operations are part of a clean Lapland, the aim is for the same message to be conveyed to customers on site at the waste collection points as well.

– Our aim is to modernise our facilities and bring them into line with regulations, as well as to ensure that waste management is perceived by customers and local residents as a tidy and well-organised system.

The new hall in Kittilä has also improved working practices from the perspective of Lapeco’s staff. Whereas working days used to begin with cleaning the outdoor area of the hall, this has now been completely phased out following its completion, and cleaning tasks are now carried out indoors by the contractors using the hall.

– This has improved staff well-being at the station. It’s not always satisfying to have to start the morning by cleaning up just to make the station look presentable for customers, Vuolli notes.

A developer with an understanding of waste management recognises the specific requirements of the operation

Lapeco operates across nine other municipalities in Lapland and has previously carried out the refurbishment of the Salla waste sorting centre in collaboration with Veloop. This collaboration has continued to be fruitful, and based on the experience gained from that facility and the newly built Kittilä hall, a similar hall project was also launched in Ivalo.

The building must be reliable and durable, and great emphasis is placed on this during the design and construction phases. Costs are kept down during the design phase by, amongst other things, avoiding expensive structural solutions and selecting appropriate surface materials.

– We think it’s good that the project is being managed by a company which itself has a background in waste management. They know how to take the specific characteristics of waste treatment into account right from the planning stage. They understand the requirements of the facilities, and the cost structure takes full account of the fact that we are not building a hotel but facilities for waste treatment.

Pertti Heinonen, a project manager at Veloop, explains what the company generally takes into account in waste management construction projects:

– The quality standards for the project take waste management requirements into account. The building must be reliable and durable, and emphasis is placed on this during the design and construction phases. Costs are kept down during the design phase by, amongst other things, avoiding expensive structural solutions and selecting appropriate surface materials.

Neither the Kittilä nor the Ivalo projects have proceeded without challenges, as right from the start the conditions on the ground in both areas took both Lapeco and Veloop by surprise. However, a revised plan was drawn up on a tight schedule, and in Kittilä the problem ultimately had almost no impact on the overall project timetable, even though it initially seemed like a major obstacle.

Heinonen explains that the construction team’s previous experience in foundation work helped to resolve the challenges rather quickly.

– As construction consultants, we aim to respond to queries from the site as quickly as possible and resolve any challenges in order to minimise the impact on both the schedule and costs at the site, he adds.

Looking beyond individual challenges, Lapeco’s Vuolli believes that the waste management infrastructure project carried out by Veloop has, on the whole, resolved a major challenge for them.

– I used to handle this myself here, but as resources became tighter, we realised that outsourcing this service was the right solution, says Vuolli.

The project in a nutshell

The Lapland Waste Management Association (Lapeco) is responsible for organising waste management in nine municipalities in Lapland.

In the construction of the transhipment and reception hall, the emphasis was on operational reliability and durability, whilst avoiding unnecessarily expensive structural and material solutions.

As Lapeco’s own resources became increasingly stretched, an external construction consultant resolved a significant resource challenge and brought the necessary expertise to the projects.

The collaboration between Lapeco and Veloop has continued from the refurbishment of the Salla waste sorting centre to the Kittilä hall and on to the Ivalo project.


Also check out these